(Soils with a high water content and high bulk density, such as wet clay, are the best conductors and require many less ground loops compared to dry sand.) Recognizing and understanding how to work with, or around, these issues are only gained from experience. With more than 30 years in dirt work excavation, Daniel Dean has seen it all: poor subsoil, such as deadpan high water levels digging on a slope prone to cave-in bedrock. Exactly right sized equipment for each job, saving machine hours and labor and keeping your costs as low as possible Why use Daniel Dean to excavate your geothermal trench or pit? Ideally, you would want to install an underground storm drainage system, providing you have the elevation. This creates a hard surface for 8 to 10 inches of crushed rock, crushed concrete or crushed limestone to be added.īefore you place the crushed material, it is also important to make sure that the sub-base is graded so water can flow off the surface. The best way to build a lay-down yard is to scrape back the top soil, import in place lime fly ash or cement and mix it into the sub-base. Erosion, flooding, and loose land can be detrimental to the area. Without any of these options you risk losing your investment. They are an essential to producing a safe area to work with. Turnkey construction services such as land clearing, site grading, soil stabilization, geotextile fabric installation and drainage are provided by the professional services of Daniel Dean.ĭepending on the leveling and condition of the area, your project may require all of these services. The construction of a laydown yard is similar to building a drive or road, where a good foundation is important.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |